Loading...
PermitPrep.AI runs a consultant-level pre-submission review of your full drawing set against the codes your project's jurisdiction actually adopted, across all 5 disciplines — so your drawings arrive at the consultant and the AHJ already clean.
From $249/mo · 5 reports included
No credit card required · 14-day free trial · Cancel anytime
Northfield_Composites_Permit_Set.pdf
52 sheets · 5 disciplines · 22.1 MB
The Problem
Every review round takes 3–5 business days. Each comment that comes back restarts the clock.
AHJ comments send the set back for another round. Weeks lost to issues that were on the sheets all along.
Each extra round adds consultant fees, often $5,000–$10,000 a review, plus holding costs while you wait.
The Old Way
Every architect knows the feeling. Weeks perfecting the design. The drawings are done. Then you submit to a code consultant — and wait. And when the comments finally come back, there are dozens of items flagged. Some real, some not. Now you're back at the drawing board, your client is calling, and the project is delayed before it ever broke ground.
$8,500 later. 5 days lost. Project delayed.
The Better Way
PermitPrep.AI eliminates that cycle entirely. Upload your drawings and get a professional compliance report before lunch — with the specific sheet, code section, and fix for every item.
20 minutes. $249/month. No surprises.
The Difference, In Numbers
How It Works
Click any step to see what happens.
Drop your complete drawing set in PDF or ZIP format. We accept sets of any size — from a 10-page tenant improvement to a 400-page new construction package.
Sample Report
A real compliance review — Northfield Composites Renovation & Expansion, Harlow MA (names and address anonymized).
The A.002 'FIRST FLOOR - COMMON PATH OF TRAVEL' table lists ROUTE D at 115'-0". Route D is drawn in the new warehouse addition (S-1), which is new construction. The Chapter 10 note on the same sheet states the sprinklered common-path limit is 100'. Exemption check: Table 1006.2.1 allows 100 ft for sprinklered B, F…
Recommendation: Reduce the common path at Route D to 100'-0" or less. This can be done by adding an exit or exit-access door, or by relocating doors in the addition so two separate egress paths become available sooner. Revise the…
The A.002 APPLICABLE CODES block lists 'FIRE CODE - 2021 INTERNATIONAL FIRE CODE NOT AMENDED'. The IFC is also used as the compliance basis elsewhere on the sheet. The Chapter 4 note '413: COMBUSTIBLE STORAGE SHALL COMPLY WITH THE INTERNATIONAL FIRE CODE' relies on it. The MAQ table footnote takes its 100% increase…
Recommendation: Revise A.002 Applicable Codes to 527 CMR 1.00, the Massachusetts Comprehensive Fire Safety Code (NFPA 1 2021). Re-cite the MAQ cabinet/safety-can increase and the combustible-storage notes to NFPA 1 Chapter 60 / NFPA…
Panel PP6 on E.703 is 225 A MLO, 208Y/120 V, 3-phase, 4-wire, with 'Supply From: PLP3 VIA T5'. The Dry Type Transformer Copper Schedule on E.702 lists T5 (75 kVA) with a 208 V secondary overcurrent device of '250A-3P' and a secondary feeder of 4#250KCMIL & 1#4G - 2-1/2"C. Schedule note 4 places that device either in…
Recommendation: Show a secondary overcurrent device rated 225 A or less on the E.702 one-line and transformer schedule. Either revise PP6 to a 225 A main-breaker panel, or provide a 225 A individually mounted breaker within 10 ft of…
Three findings per discipline shown here. See the full sample report.
Nationwide Coverage
Hover any state to see its adopted code edition and coverage.
Tribal land detection with tribe-specific codes where published.
Tap any state for details · Jurisdiction data updated monthly
Map shows state-level adoptions. Major cities may have local amendments (e.g. NYC, Chicago) — contact us for city-specific analysis.
The Difference
Who It's For
Catch code issues before submission. Stop paying for costly revision cycles.
Review drawings before breaking ground. Avoid permit denials that delay your schedule.
Discipline-specific compliance review across mechanical, electrical, and plumbing.
Review every project in your pipeline simultaneously. Scale your pre-construction process.
Streamline plan review with AI-assisted pre-screening.
Use PermitPrep.AI as a first pass to focus your expertise on complex issues.
What We Analyze
For Municipalities
Give applicants a branded public submission portal, pre-screen every drawing set with AI before it reaches a reviewer, and manage determinations from a single dashboard — reducing review backlogs and turnaround time.
Pricing
Every plan includes a 14-day free trial with 2 reports (10 for Enterprise teams). No credit card required. Cancel anytime.

I have been in and around commercial construction my entire career. The one thing that never made sense to me was why catching a code issue takes two weeks and costs thousands — when it could be caught in 20 minutes.
Permit delays cost the construction industry billions every year and most of them are preventable. I built PermitPrep.AI to change that — putting the power of a professional code review in your hands before you ever walk into a building department. Not to replace the expertise of licensed professionals, but to make every architect, engineer, and contractor on the project team smarter before submission day.
— Eddie Silva, Founder, PermitPrep.AI
Enterprise Infrastructure
Drawings are stored in encrypted AWS S3 and processed securely.
99.9% uptime target on managed cloud infrastructure.
We never share your drawings and never train AI models on them. Drawings are deleted after 90 days.
FAQ
PermitPrep.AI is a powerful decision-support tool designed to complement professional review — not replace it entirely. Our reports identify potential compliance issues before formal submission, reducing costly surprises and revision cycles. All reports include a clear disclaimer that findings should be verified by the Authority Having Jurisdiction.
We check against all major model codes including IBC, IFC, IMC, IPC, IECC, NEC, NFPA 13/72/101, ADA 2010, and ANSI A117.1. We hold adopted code editions for all 50 states, with state and local amendment data for 46 states (section-level detail for 29 so far) and growing. Each report states whether amendment data was applied for its jurisdiction. Tribal land detection with tribe-specific codes where published.
Every finding cites the applicable ICC-published code section, so you can verify each item directly against the source. PermitPrep.AI is a decision-support tool designed to surface potential compliance issues before formal submission; all findings should be verified by the Authority Having Jurisdiction.
We accept PDF, DWG, and DXF files. Most drawing sets can be uploaded as a single PDF, a DWG/DXF file, or a ZIP containing multiple files.
Yes. All drawings are stored in encrypted AWS S3 buckets and processed securely. We never share your project data with other users. Drawings are retained for 90 days then permanently deleted. We do not use your drawings to train AI models.
We handle full multi-page drawing sets across all 5 disciplines. Most projects complete in about 20 minutes; very large sets may take longer.
Yes — we support all IBC occupancy classifications including residential, commercial, mixed use, institutional, industrial, and assembly. We also support tenant improvements, renovations, and new construction.
Contact us at hello@permitprep.ai and we will review the report manually. We stand behind our product and will work with you to resolve any questions about findings.
Upload a drawing set and see exactly where your project stands — in about 20 minutes.